Last Updated: 07/28/2022

Latest Update

July 28, 2022

Project Status: Complete
Photos below show new solar tubes added as part of the roofing project, introducing natural lighting into the interior kitchen and dining areas that previously did not have any natural light.  These photos were taken without artificial lighting on in the room and without a flash.
FS10 Dining Solar Tube
Fire Station 10 Dining Room with New Solar Tube Lighting
FS10 Solar Tube Kitchen
Fire Station 10 Kitchen with New Solar Tube Lighting

Project Overview

This project will replace the existing roof at Fire Station 10, add a skylight to provide day-lighting to interior living spaces, and provide safe roof access for maintenance personnel.

Project Schedule

City User Agency: City of Madison Fire

Project Status:  Completed
1st Advertisement of Bid: 06/03/2021 available on Bid Express
Pre-Bid Building/Site Meeting:
Tuesday, August 10, 2021 @ 9:30 am at the project site, 1517 Troy Dr., Madison
Bid Due Date: 09/09/2021
Construction Start Date: 11/01/2021
Expected Completion Date: 07/15/2022
"All information regarding dates/times/locations are informational and should be verified with official bidding documents posted on Bid Express."

Sustainability Goals: 

This project will prepare the building for future installation of solar photovoltaic (PV) panels. It will also provide daylighting to interior spaces, reducing the need for artificial lighting.

Project History

October 12, 2021 File #67297
Awarding Public Works Contract No. 8243, Fire Station 10 Roof Replacement

April 26, 2021 File #64828
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for project known as Fire Station 10 Roof Replacement. (18th AD)