Date & Time: 
Wednesday, November 29, 2023 - 6:30pm to 8:30pm
Location(s): 

A public information meeting  has been scheduled for 6:30 p.m., Nov. 29, 2023, via Zoom. Registration prior is required. 
Nov. 29, 2023 Public Information Meeting Registration  

A survey is now available. Please take the survey before 5 p.m., Dec. 7, 2023. 
Knutson Drive Reconstruction- Green Avenue- Northport Drive Survey 

Project Overview
The City is planning to reconstruct Knutson Drive (Green Avenue to Northport Drive). The project includes a new street design with curb and gutter, sidewalk, and driveway aprons. The asphalt pavement and gravel base will be replaced. The sanitary sewer and water main will remain. The project will add storm sewer and stormwater features for controlling surface water runoff.
 
The City is planning to resurface Knutson Drive (Heffernan Drive/Beilfuss Drive to Green Avenue). The project includes installing storm sewer from Heffernan Drive to Knutson Drive east of Green Avenue and remove and replace the asphalt pavement. 

The City is planning to resurface Green Avenue (Harper Road to Knutson Drive). The project includes removing and replacing a portion of the asphalt pavement.

Learn more about the project on the City's Knutson Drive Project Page.

Event Cost: Free
Wheelchair Accessible: Yes
Pre-Registration?: Yes
American Sign Language (ASL) Provided?: No

Last Updated : 11/07/2023
Agency: Engineering