Weekend of May 7-8

We are going into another sequence of the remodel which requires closing hoist 1 and 2 area. The temporary walkway that was being used along 2 hoist is moving to 5 hoist. Over the weekend we will be moving the walkway to the location on the maps labeled as “Future walkway.” This goes through 5 hoist and the new hoist area to the center door to the garage.

With the dispatch restrooms closing on Monday there will still be access from the main hallway to the old dispatch window/stairs/elevator.

Metro 1101 construction

 

Josh Marty
Buildings and Grounds Supervisor

P: (608) 267-8763
C: (608 234-1387