Latest Update 

4/28/2023 Update:
Construction work on the project is scheduled to start the week of May 8, 2023. The limits of the project are confined to City owned property located at 1661 Meadow Road, 1524 Feather Edge Drive, and 10002 Treetops Drive, as well as within public street right-of-way on Meadow Road. Work will include excavation of stormwater ponds and channels, construction of access paths, and construction of a bridge. The contractor performing the work is Integrity Grading and Excavation, Inc. Construction activities are anticipated to finish up by the end of August. For additional information about the project, please contact the project engineer Janet Schmidt, jschmidt@cityofmadison.com.

Project Overview

The Stormwater Utility is proposing a project to construct a series of regional detention basins north of Mid Town Road, and east of Meadow Road. The purpose of the ponds will be to contain flood water, reducing downstream flooding and minimizing local flood impacts. As part of the project City Engineering is proposing to extend Feather Edge Road from the existing terminus to Meadow Road. The City Parks Division will also be discussing a future master planning effort for the proposed Hill Creek Park expansion.

Project Schedule

Final Design – Fall 2022
Construction – 2023
Pertinent meetings dates, such as Board of Public Works and Common Council, will be posted on this project page.

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates and times are indicated below:

Public Information Meetings

City Meetings, Process 

Board of Public Works

Information will be posted when available. 

Common Council 

Information will be posted when available.