Last Updated: 10/04/2023

Latest Update

October 04, 2023
Project Status: Construction

Project Overview

Installation of a roughly 35 kW solar photovoltaic system at the Engineering Operations Facility. The system will be roof mounted modules and will produce an estimated 45,500 kWh per year. The systems production will be used to charge Electric Vehicles used by the Engineering Division. When combined with the building’s existing roof mounted systems, 68.5% of the building’s electricity usage will be generated by the solar arrays. The array will be installed by the Engineering Division’s GreenPower program where trainees with little to no electrical skills are provide on-the-job training through solar installations on City buildings.

Project Schedule

City User Agency: City of Madison Engineering
Planning and Design: January – June 2022
1st Advertisement of Bid: N/A
Bid Due Date: N/A
Construction Start Date: October 2023
Expected Completion Date: December 2023