Last Updated: 12/17/2021

Updated: December 17, 2021

Project delayed. Planning and Design scheduled for 2022


Solar Electric Installation

Installation of a roughly 30 kW solar photovoltaic system at the Engineering Operations Facility. The system will be roof mounted modules and will produce an estimated 39,000 kWh per year. The systems production will be used to charge Electric Vehicles used by the Engineering Division.


City User Agency: City of Madison Engineering
Planning and Design: January – June 2022
1st Advertisement of Bid: TBD
Bid Due Date: TBD
Construction Start Date: TBD
Expected Completion Date: TBD