Last Updated: 08/10/2023

Latest Update

Construction is complete. Braxton Place and La Mariposa Lane is open for all users. The shared-use path between Braxton Place and Regent Street is complete and is for bicycle and pedestrians use only. Please do not drive a motorized vehicle on the path.

The east side of La Mariposa Lane and the shared-use path are active construction sites as part of the Bayview redevelopment. The sidewalk will be constructed along the east side of the street in the fall of 2023 by the private development team. The sidewalk along the east side of the shared-use path will be constructed in the fall of 2024 by the private development team.

Project Overview

The City is planning to construct a new street named La Mariposa Lane from Braxton Place to West Washington Avenue. The City is also planning to construct a shared-use path connecting Regent Street to La Mariposa Lane. The City plans to install sanitary sewer, storm sewer, stormwater facilities, asphalt, curb and gutter, driveway aprons, street lighting, pavement marking, and signing along La Mariposa Lane. The City also plans to install a sanitary sewer along the north side of Braxton Place through La Mariposa Lane. The project construction will occur in 2023.

Exhibit for proposed layout of La Mariposa Lane

View Proposed Assessments

Project Limits

Braxton Place (new street surface) – S. Park Street to La Mariposa Lane

La Mariposa Lane (new street) – West Washington to Regent Street

Project Schedule

Design: Winter/Spring 2022
Bids Advertised: Fall 2022

Construction: Spring-Summer 2023

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

City Process, Meetings

Board of Public Works: May 11, 2022

Common Council: May 24, 2022