Last Updated: 10/12/2020

Latest Update

Project complete.

Project Details

This project is the replacement of the existing pedestrian bridge over Wingra Creek, just south of the intersection of West Wingra Drive and South Street.  The steel bridge beams are rusted on the underside and the bridge structure is in need of replacement. The proposed project includes replacement of the prefabricated bridge structure with a similar structure. The existing abutments (the foundations of the bridge) on both sides of the creek are in good condition and can be reused. The new prefabricated bridge will be installed using a crane and the approaches on both sides will be repaved.

Public Meeting

A Public Information Meeting to discuss the project was held on Wednesday 12/6/17 at 3:00 PM at Strand Associates: 910 West Wingra Drive.