Project Overview

The project includes construction of Cedar Street from Fish Hatchery Road to South Park Street, the reconstruction of South Street from West Wingra Drive to Midland Street and High Street from the cul de sac to South Street, and the resurfacing of West Wingra Drive from Fish Hatchery Road to South Street. The new portion of the Cedar street will include sanitary sewer, stormwater bioretention, asphalt pavement, gravel base, curb, sidewalk on both sides of the street, marked bike lanes, and parking on one side of the street. Cedar Street will be 40 feet from face of curb to face of curb.

The reconstruction of South Street includes the replacement of sanitary sewer, water main, storm sewer, asphalt pavement, gravel base, curb, and spot replacements of sidewalk. South Street will be 32 feet (north of Cedar) and 34 feet (south of Cedar) from face of curb to face of curb. On South Street, parking will be maintained on one side north of Cedar Street and both sides south of Cedar Street.

The reconstruction of High Street includes replacement of sanitary sewer, storm sewer, asphalt pavement, gravel base, the addition of curb, and sidewalk added to the east side of the street. High Street will be 28 feet from face of curb to face of curb and have parking on the east side of the street.

The resurfacing of West Wingra Drive includes replacement of sanitary sewer, water main, asphalt pavement, gravel base, and spot replacement of curb and sidewalk. West Wingra Drive will be 44 feet from face of curb to face of curb and have parking on both sides of the street. The intersection of South Street, High Street, and Midland Street will be reconfigured to provide safer accommodations for vehicles, pedestrians, and bicycles. The intersection of Cedar Street and South Park Street will be reconfigured with the addition of traffic islands to prevent Cedar Street cross traffic as well as provide safer crossings for pedestrians and bicycles. The intersection of Cedar Street and Fish Hatchery Road will include two pedestrian crossings and a traffic island.

Click here to view bigger map

project location map for Cedar ST. south street, high street and west wingra drive

Project Limits

Cedar Street (new) – Fish Hatchery Road to South Park Street

South Street – West Wingra Drive to Midland Street

High Street – cul de sac to South Street

West Wingra Drive – Fish Hatchery Road to South Street

Project Schedule

Design 2020

Construction 2021: Cedar St (South St – S. Park St), South St, High St, and W. Wingra Dr

Construction 2022: Cedar St (Fish Hatchery Rd to South St

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates and times are indicated below:

Public Information Meeting

The City hosted a virtual Zoom public informational meeting 6 p.m., May 27, 2020, via Zoom.
View May 27 Virtual Public Information Presentation.

Virtual Meeting Format
The May 27 meeting was held virtually online via Zoom. It included a presentation and question and answer portion for attendees.

City Meetings, Process

Approving the geometry for all streets.

Introduction to Common Council: June 16, 2020

Transportation Commission Approval: June 24, 2020

Board of Public Works Approval: July 8, 2020

Common Council Approval: July 21, 2020